Pay in 4 interest-free payments of $9.74 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 20 - Aug 25
Pay in 4 interest-free payments of $9.74 Learn more
Ships within 48 hours · Estimated delivery Aug 20 - Aug 25
Liveries and model details may vary slightly from production models
Fuselage length: 191mm
Greater realism during operating sessions with multiple locomotives
Built ‘in-house’ at BR’s Crewe
CITV and gunner's sight lens cover can be assembled opened or closed
376-276A LNER Thompson Brake Third Corridor BR Crimson & Cream E1917E option-set-083 Liveries and model details mayEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
US$ 123.25
US$ 119.00
US$ 39.99
US$ 72.00
US$ 49.99