Pay in 4 interest-free payments of $9.74 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 19 - Aug 24
Pay in 4 interest-free payments of $9.74 Learn more
Ships within 48 hours · Estimated delivery Aug 19 - Aug 24
Beside the 16 track occupancy detectors or feedback sections
LIVERY GWR Bauxite
WAGON CLASS 8 Plank
Choose the mode by setting the rotating drum in one of two positions
Introduced in 1995
374-863 LNER Thompson Full Brake BR Blue E11 Stock-Alert-15 Beside the 16 track occupancyEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
US$ 499.50
US$ 499.50
US$ 499.50
US$ 114.00
US$ 34.00
US$ 169.00
US$ 2950.00
US$ 500.00
US$ 119.99
US$ 31.34
US$ 32.26